¦ Door flap
 L===  8'  ===T===  8'  ===T=== 7' ===T===  8'  ===L
 |            ¦            ¦          ¦            |
 |            '            '          '            | 
10'          10'          10'        10'          10'
 |                                                 |
 |            ¦            ¦          ¦            | 
 T---  8'  ---O---  8'  ---O--- 7' ---O---  8'  ---T
 |            ¦            ¦          ¦            | 
 |            '            '          '            | 
10'          10'          10'        10'          10'
 |                                                 |
 |            ¦            ¦          ¦            |
 L===  8'  ===T===  8'  ===T=== 7' ===T===  8'  ===L

  Poles  
SIZEDESCRIPTION
12'4 corner uprights ("L" flange)
12'8 outside uprights ("T" flange)
12'3 interior poles (4-way flange)
10'4 floor + 10 ceiling widths  (14)
  8'6 floor + 9 ceiling lengths   (15)
  7'2 floor + 3 ceiling lengths     (5)
Suggested procedure:
  1. Layout the bottom perimeter using the color coded sizes according to the diagram.
  2. Place the 12' red uprights on the ground with the top flanges facing away from the concrete slab.
  3. Rearrange the perimiter polls and uprights so that the bottom flanges all match up.
Hint: Place all wood slats inside the sukkah before putting up the canvas sides.

Other materials required:

  • At least 2 6' ladders
  • large bag of nylon ties,
  • at least 2 1/4" allen wrenches
  • plenty of volunteers